Commercial Façade and Entrance Systems

Curtain Wall and Storefront Systems Coordinated for Commercial Projects

Coordinate façade elevations, grid dimensions, aluminum framing, glass, anchors, perimeter interfaces, entrances, operable components, finishes, performance criteria and project documentation around the architectural and structural design.

Elevation and Grid Review Glass, Framing and Interface Coordination Submittals, Checks and Protected Packing

System Type and Building Use

Select the Façade System Before Refining Profiles and Glass

Curtain wall and storefront are not interchangeable labels. Building height, exposure, grid, structural movement, drainage, performance criteria and installation sequence determine the appropriate system.

Comparison of stick-built curtain wall, unitized curtain wall, storefront glazing and integrated entrances
01Site-Assembled Grid

Stick-Built Curtain Wall

Vertical mullions and horizontal members are assembled at the building before glass and infill are installed. Review floor-to-floor geometry, anchors, splice locations, access and field glazing sequence.

  • Custom elevation grids and module sizes
  • Pressure-capped or system-specific glazing
  • Field installation and perimeter coordination
02Prefabricated Modules

Unitized Curtain Wall

Factory-assembled modules may be considered for suitable projects. Module dimensions, slab-edge anchors, inter-panel joints, tolerances, transport, lifting access and installation sequence must be coordinated together.

  • Floor-to-floor or project-specific modules
  • Factory glazing subject to agreed scope
  • Early logistics and structural coordination
03Ground-Floor Commercial Glazing

Storefront Systems

Storefront framing is commonly considered for lower-height, protected or interior commercial openings. It should not be substituted for curtain wall without reviewing exposure, drainage, structural and performance requirements.

  • Retail and office entrance zones
  • Fixed glazing with compatible doors
  • Head, sill and perimeter interface review
04Integrated Openings

Entrances, Windows and Louvers

Entrance doors, operable vents, windows, louvers, sunshades and other façade elements require coordinated openings, loads, drainage, flashings, controls, hardware and replacement access.

  • Door and operable-panel interfaces
  • Structural support and perimeter seals
  • Hardware, controls and access planning
Curtain wall assembly showing mullion, transom, glass, spandrel, anchor and drainage interfaces

Complete Façade Assembly

Coordinate Framing, Glass, Anchors and Perimeter Interfaces Together

Curtain wall is generally a non-load-bearing enclosure that transfers its own weight, wind and other applicable loads to the building structure through designed connections. Final structural adequacy remains project- and system-specific.

  • Align façade grids with slabs, columns, walls, partitions and finished ceiling or floor lines.
  • Coordinate mullion, transom, anchor, splice, pressure plate, cap or structural-glazing details.
  • Define vision glass, opaque or spandrel zones, shadow boxes, backpans and insulation where applicable.
  • Resolve perimeter seals, flashings, drainage, slab-edge interfaces, fire safing and interior closures.

The approved shop drawings, calculations, material schedules and project details—not a generic profile image—should define the proposed assembly for each elevation and interface.

Mullions and Transoms

Review profile depth, reinforcement, jointing, splices, pressure plates, caps, gaskets and visible sightlines.

Glass and Infill

Define vision glass, opaque panels, spandrel build-up, coatings, frit, laminates, thickness and edge requirements.

Anchors and Movement

Coordinate slab-edge anchors, embeds, fasteners, tolerances, building movement, thermal movement and installation access.

Drainage and Perimeters

Review internal drainage paths, end dams, weeps, perimeter sealants, flashings, waterproofing and adjacent construction.

Glass, Finish and Components

Turn the Architectural Elevation Into a Coordinated Material Schedule

Appearance and performance depend on the complete combination of framing, glass, opaque zones, seals, finishes, entrances and adjacent construction.

Curtain wall glass, spandrel panel, aluminum finish, gasket and sealant options
Vision Glass

Glazing Make-Up

Coordinate monolithic, laminated or insulating glass, heat treatment, coatings, tint, frit, safety locations, edge treatment and required evidence for the proposed sizes.

Opaque Zones

Spandrel and Infill

Review spandrel glass, metal panels, backpans, insulation, shadow boxes, interior appearance, condensation risk, fire-safing interfaces and access.

Aluminum Appearance

Profiles and Finish

Define exposed sightlines, pressure caps, internal and external colour, anodized or powder-coated finish, gloss level and controlled approval samples.

Integrated Components

Doors, Windows and Louvers

Coordinate entrance frames, thresholds, locks, closers, operable windows, vents, louvers, screens and controls with the surrounding façade grid and drainage.

Air, water, wind, thermal, acoustic, impact, seismic, fire or security requirements must be matched to the proposed complete assembly and applicable project documentation.

Selection Checklist

Resolve Building Conditions Before Selecting the Façade System

A similar glass elevation can require different framing, anchors, glass, drainage, joints and testing when building height, exposure, movement or code requirements change.

Curtain wall selection checklist covering grid, anchors, movement, drainage and perimeter interfaces
01

Elevation and Grid

Confirm façade limits, module dimensions, floor-to-floor heights, corners, transitions, entrances, opaque zones and interfaces with adjacent materials.

02

Structure and Movement

Identify design loads, slab-edge conditions, anchor zones, deflection, inter-story movement, thermal movement, seismic criteria and construction tolerances.

03

Air, Water and Drainage

Define exposure, required air and water criteria, pressure equalization, drainage paths, perimeter flashing and field sealant responsibilities.

04

Thermal and Condensation

Review climate, framing, thermal breaks, glass, edge spacers, opaque zones, interior conditions, surface temperatures and declared project values.

05

Safety and Interfaces

Coordinate safety glazing, fall protection, fire-safing, accessibility, entrance thresholds, maintenance, cleaning, replacement and interior closures.

06

Codes, Testing and Evidence

List applicable standards, required calculations, test reports, mock-ups, inspections, approvals and the authority responsible for acceptance.

Quotation Preparation

Information Needed for a Comparable Façade Quotation

A rendered elevation shows design intent, but a comparable quotation also needs dimensions, interfaces, glass, finishes, performance criteria, documents and logistics information.

Curtain wall elevation, grid references and material schedules prepared for quotation
InputWhat to ProvideWhy It Matters
Plans and ElevationsFaçade limits, grids, floor levels, corners, entrances, operable elements, opaque zones and quantities.Creates the basis for scope take-off, system selection and drawing coordination.
Building StructureSlab edges, columns, walls, embeds, anchor zones, movements, tolerances and available structural information.Affects anchors, mullions, joints, modules, support and installation sequence.
System IntentStick-built, unitized or storefront; profile appearance; pressure caps or other glazing expression.Prevents visually similar but technically different systems from being compared as equals.
Glass and InfillVision glass, coatings, tint, frit, safety requirements, spandrel, metal panels, backpans and insulation.Affects weight, modules, heat, light, safety, appearance and documented performance.
Performance CriteriaRequired air, water, wind, structural, thermal, acoustic, impact, seismic, fire or other criteria.Allows proposals and evidence to be checked against the actual project requirement.
Interfaces and ScopePerimeter seals, flashings, fire safing, interior closures, canopies, louvers, doors, windows and site works.Clarifies responsibilities, exclusions and coordination boundaries.
Submittals and TestingRequired shop drawings, calculations, samples, mock-ups, laboratory or field testing, reports and inspection records.Identifies approval work and documentation that must be included in the proposal.
Project and LogisticsProject location, access, floor sequence, lifting constraints, packaging, delivery point and programme milestones.Supports exposure review, module planning, packing and realistic logistics coordination.

Ask each quotation to identify system assumptions, inclusions, exclusions, glass, finish, anchors, sealants, loose materials, submittals, testing, packing and installation responsibility.

Project Coordination

From Façade Elevations to Approved Production Information

Production release should follow coordinated grids, interfaces, glass, framing, anchors, finishes, performance criteria and required approvals—not a concept rendering alone.

Design Information Review

Review plans, elevations, grids, levels, openings, structure, exposure, performance criteria, project location and missing inputs.

System and Scope Proposal

Coordinate system type, modules, framing, glass, opaque zones, entrances, anchors, drainage, finishes, interfaces and responsibility boundaries.

Submittal and Approval

Prepare the agreed drawings, schedules, calculations, samples, mock-ups or product documents for project-specific review before release.

Production and Delivery Coordination

Follow approved information, record agreed checks, protect glass and finishes, label packages by elevation or module, and coordinate delivery sequence.

Submittals and Traceability

Link Drawings, Approvals, Checks and Packages to the Façade Scope

Required documents and records vary by project. Agree the responsible party, review sequence and acceptance criteria before the façade package is released.

Curtain wall elevations and interface details reviewed for project approval
Before Approval

Drawings, Schedules and Calculations

Coordinate the documents required to define modules, profiles, anchors, glass, panels, joints, entrances, perimeters and movement.

  • Elevations, plans, sections and details
  • Glass, finish and component schedules
  • Project-specific calculations when required
Curtain wall mock-up reviewed during a controlled water test
Before Release

Samples, Mock-Ups and Testing

Record approved appearance and required verification. Testing should follow the project specification and an agreed specimen, procedure and acceptance basis.

  • Finish, glass and sealant references
  • Visual or performance mock-ups
  • Laboratory or field records where required
Curtain wall glass and aluminum components protected and labeled for export packing
Before Dispatch

Inspection, Labels and Protected Packing

Apply the agreed inspection scope and keep finished materials traceable to elevation, floor, grid, module or package references.

  • Dimensions, finish, glass and component checks
  • Protection for corners, caps, glass and seals
  • Referenced crates, racks and accessory boxes

Product checks, photos or videos do not replace project-required calculations, system test reports, façade testing, qualified professional review or site acceptance.

v

Frequently Asked Questions

Curtain Wall and Storefront Project Questions

Final answers depend on the selected system, façade geometry, building structure, exposure, glass, interfaces, installation and required project documentation.

What is the difference between curtain wall and storefront?

Curtain wall is a non-load-bearing exterior enclosure designed and connected for project-specific building loads, movement, drainage and performance. Storefront is typically a shallower commercial glazing system considered for lower-height, protected or interior applications. They should not be substituted without technical review.

Is a curtain wall load-bearing?

Curtain wall generally does not carry building floor or roof loads. It transfers its own weight, wind and other applicable façade loads to the supporting structure through designed framing and anchors. The final load path and adequacy require project-specific engineering.

Can the façade grid, glass and aluminum finish be customized?

Grid dimensions, profile expression, caps, glass, opaque zones, colours and finishes can be coordinated around the architectural elevation, system limits, structural requirements, appearance samples and available documentation.

Can entrance doors, operable windows or louvers be integrated?

Compatible doors, windows, vents and louvers may be incorporated where openings, support, drainage, flashings, seals, hardware, controls, maintenance and perimeter interfaces are resolved in the façade drawings.

How are thermal and condensation requirements reviewed?

Review climate, frame construction, thermal breaks, glass, spacers, spandrel zones, interior conditions, perimeter details and required project values as one assembly. Accept declared performance only when applicable evidence covers the proposed configuration.

Can test reports, calculations and mock-ups be provided?

Availability and scope vary by system and project. State the required standards, calculations, laboratory or field tests, mock-ups, specimen sizes, procedures and acceptance criteria during enquiry so the proposed documentation can be reviewed.

What information should I send for a quotation?

Send architectural plans and elevations, façade grids, levels, structural interfaces, preferred system, glass and panel schedule, finish, entrances and operable elements, performance criteria, required submittals, project location, programme and delivery information.

Start With Your Façade Drawings

Send the Elevations, Grid Dimensions, Glass and Performance Requirements

Our project team can review the available information, identify missing system or interface inputs, and coordinate framing, glass, entrances, finishes, documentation and quotation assumptions.

George House Material Company Logo